Wichtiger Hinweis
7th cover sheet for development plan no. 181
Stand: 28.02.2025
- Stubenloh-South -
Publication of the drafting resolution in accordance with Section 2 (1) sentence 2 of the German Building Code (BauGB) and early public participation in accordance with Section 3 (1) BauGB from 28.02.2025 up to and including 31.03.2025
Preparation of the 7th cover sheet for development plan no. 181 - Stubenloh-Süd - with integrated green space plan and early public participation
The Environment, Transport and Planning Committee of the City of Erlangen decided in a public meeting on
meeting on 12.12.2023 to draw up the 7th cover sheet for development plan no. 181 - Stubenloh-Süd - with integrated green structure plan for the Nürnberger Straße, Werner-von-Siemens-Straße, Hofmannstraße, Hartmannstraße and Schenkstraße area in accordance with the provisions of the German Building Code (BauGB).
In accordance with Section 2 (1) sentence 2 BauGB, the decision to draw up the plan is hereby published in accordance with local custom.
The spatial area of application is shown in the site plan printed below. The map is based on the extract from the real estate cadastre from February 2025.
In accordance with the provisions of the German Building Code (Section 3 (1) BauGB), early public participation will be carried out. The objectives and purposes of the planning are presented to the public, who are given the opportunity to comment and discuss them.
The preliminary draft of the development plan with the explanatory statement including the environmental report will be presented to the public on the Internet from February 28, 2025 up to and including March 31, 2025.
Comments can be submitted during the publication period. These should be sent electronically to the e-mail address bauleitplanung@stadt.erlangen.de. If required, comments can also be submitted by other means.
The following types of environmental information are available
Soil expertise, species protection expertise, immission control expertise, traffic expertise, tanning study
In addition to publication on the Internet, the preliminary draft of the development plan with explanatory statement including environmental report will be on public display at the Office for Urban Planning and Mobility (Gebbertstraße 1, 3rd floor) from 28.02.2025 up to and including 31.03.2025 during opening hours (Monday to Friday, 9:00 - 12:00). There will be an opportunity to comment and discuss.
Mr. Joffroy is available for inspection outside this period and for information and advice by prior appointment (Tel. 09131 / 86 -1371 or email: stefan.joffroy@stadt.erlangen.de).
The preliminary draft development plan will be presented to interested citizens at a public information event on Wednesday, March19, 2025 at6:00 p.m. in the city archive, ground floor reading room, Luitpoldstraße 45, 91052 Erlangen. The event room is accessible by elevator.
The relocation of the Siemens site in the quarter on Werner-von Siemens-Strasse to the Siemens Campus was accompanied by the closure and marketing of the existing commercial properties there. The "Siemens-Mitte" property (Elefantentreppe, Glaspalast "blue high-rise", Bingelhaus, Casino and multi-storey parking lot), which covers around 35,000 square meters and comprises a total of five buildings, was acquired by the developer with the aim of creating a high-quality, inner-city district development that would include residential and office space.
In order to develop a compatible concept in view of the inner-city location, the direct proximity to the listed Raspberry Palace and the listed blue high-rise building (vertical slab) with casino (horizontal slab) located on the site, an invited architectural design competition with an ideas section for the future new development was held by the developer in consultation with the administration.
The implementation of the 1st prize is not possible on the basis of the existing building law. In order to ensure orderly urban development and create the legal basis for construction planning, the 7th cover sheet for development plan no. 181 is being drawn up.
An urban and mixed-use quarter is to be developed on the basis of the first award, taking into account the urban retail concept and the entertainment venue concept. In order to continue to allow both predominantly residential use and non-essentially disruptive commercial enterprises in the eastern area, the areas are included in the scope of application and only the type of use is adjusted. The other stipulations, such as the extent of use and the areas of land that can be built on, will not be adjusted in this area.
The aim of the planning is thus to create a lively inner-city district that offers space for living and working in an innovative and at the same time economical form in accordance with the principle of the city of short distances and pursues the goal of sustainable construction.
The specific objectives are
- Meeting demand for required living space and for different population groups
- Creation of areas for non-disruptive businesses
- Creation of areas for social and cultural facilities
- Further development of the "Red Square" into a green square
- Upgrading of the open spaces and the associated intensive use/ quality of stay
- Implementation of the principles of the sponge city and water-sensitive settlement development
The preliminary draft of the development plan is also on display in the town hall foyer during the presentation period.
If you wish to submit a statement on the urban land-use plan currently being drawn up as part of the public participation process, we will process your statement in the corresponding procedure.
The City of Erlangen, Rathausplatz 1, 91052 Erlangen, e-mail: poststelle@stadt.erlangen.de, Tel. 09131 86-0 is responsible for processing your data.
The data you provide in the context of public participation in accordance with the provisions of the German Building Code will be processed by the City of Erlangen exclusively in the context of urban land-use planning.
The legal basis for processing is Art. 6 para. 1 letter e GDPR in conjunction with Art. 4 para. 1 Bavarian Data Protection Act (BayDSG).
You can find further information about the processing of your data and your rights regarding the processing of your data on the Internet at www.erlangen.de/datenschutzhinweise-bauleitplanverfahren. Alternatively, you can also obtain this information from the administrator named in the notice.
Galerie
7D 181 Preliminary draft
01- Tree population
05- Traffic study
06- Noise immission analysis
07- Tanning study
Available environmental comments
7D 181 Preliminary draft
01- Tree population
05- Traffic study
06- Noise immission analysis
07- Tanning study
Available environmental comments
Department of Urban Planning
Anschrift
Öffnungszeiten
Individual appointments can also be arranged.