3140-111_1_CBBE Screed, Phase 2
Stand: 06.07.2026
Screed, Phase 2
Link to the call for proposals
Procurement
- Procurement Regulations
VOB-EU
- Procurement procedure
Open procedure
- Division into Lots
No
- Alternative bids permitted
No
- Multiple main bids permitted
No
Dates and Deadlines
- Implementation period
October 1, 2026, through September 30, 2027
- Tender deadline
August 4, 2026, 10:15 a.m.
- Opening Date
August 4, 2026, 10:15 a.m.
- Bid validity period
October 6, 2026
- Questions from applicants accepted until
July 28, 2026, 10:15 a.m.
Submission Format
electronically in text form
CPV Codes
45262320-0 Screed work
45262321-7 Screed work (flooring)
Brief description of the service
BT E+Comb.:
3,100 m² cleaned;
145 m² of fill, 12–18 mm;
175 m³ loose fill, 20–25 mm;
1,220 m² PE film, 2x0.2, cross-woven;
3,100 m² PE film, 1x0.2;
2,385 m perimeter insulation, PE, H = 80–130 mm;
805 m² BD, EPS, 30 mm;
655 m² EPS, 30 mm;
905 m² EPS, 40 mm;
320 m² EPS, 60 mm;
2,815 m² TSD, EPS, 20 mm;
175 m² TSD, EPS, 30 mm;
2,015 m² ZE, CT-F5-S65, 5 kN/m², D = 65 mm;
915 m² ZE, CT-F5-S55, 3 kN/m², D = 55 mm;
135 m² ZE, CT-F5-S40, 2 kN/m², D = 40 mm;
925 m² ZE, CT-F5-S65, 5 kN/m², D = 40 mm;
475 m² CAF-F5-S85-H 65.5 kN/m², D = 85 mm;
35 m storage area up to 40/60/3;
155 m parking area up to 140/100/4;
125 m screed profile, 12/80 mm;
BT B:
130 m² underfloor cleaning;
71 m² PE film, 2x0.2, laid crosswise;
75 m² PE film, 1x0.2;
60 m² of raw glass fiber separation mat, 50 g;
60 m² FPO covering;
320 m perimeter insulation, PE, H = 80–130 mm;
190 m² BD, EPS, 20–50 mm;
115 m² TSD, EPS, 20–25 mm;
50 m² ZE, CT-F5-S65, 5 kN/m², D = 65 mm;
10 m² ZE, CT-F5-S55, 4 kN/m², D = 55 mm;
21 m² ZE, CT-F5-S40, 2 kN/m², D = 40 mm;
455 m² CAF heating element, CAF F5-S75-H55, 3 kN/m², D = 75 mm;
60 m² CAF-F5-S55, 3 kN/m², D = 55 mm;
25 m of storage wall up to H = 130 mm;
20 m end wall up to 125/90/3;
35 m composite wall up to 180/100;
15 m screed profile, 12/80 mm