Stand: 26.02.2026
Closures from March 2 to May 29. This is due to work on the sewage network.
In Ahornweg, two inspection chambers in the public area of the wastewater network are being replaced using the open trench method. Construction begins on March 2. Construction will end on May 29. In order to keep restrictions for residents to a minimum, the work will be carried out in sections one after the other. Nevertheless, it is necessary to partially or completely close the road area during the construction period. There may therefore be traffic disruptions during the construction period and in the affected detour roads. Local traffic will be taken into account and maintained as far as possible.
Residents directly affected will also be informed separately by the drainage company by means of a leaflet. If you have any questions about the measure, please contact the person responsible at the drainage company on 09131 / 86-2108. The company carrying out the work can also be contacted on site for direct queries.
The drainage company and the contractor are endeavoring to complete the project as smoothly and quickly as possible. The aim is to keep obstructions and restrictions to a minimum at all times during the project.
Photo: Drainage company - Ahornweg in Bruck
Drainage company - Construction department
Anschrift
Öffnungszeiten
Individual appointments can also be arranged.