Examination of 10. flood Schwabachanlage
Stand: 28.05.2024
Citizens' meeting Sieglitzhof 6.4.2022
10. flood Schwabachanlage
The newly extended path at the Sieglitzhofer Steg is flooded during heavy rain.
Response from the civil engineering office:
On the restricted public path described between Bogenweg via Sieglitzhofer Steg to Ritzerstraße, only the previously partially unpaved or damaged/poorly paved surface was resurfaced and the substructure partially renewed. No fundamental changes were made to the elevation.
As far as we know, the path has always been flooded or under water.
The reinforcement was only intended to reduce the extent of damage caused by future water and to create a safe road surface as part of the operational repairs.