Wichtiger Hinweis
5th cover sheet for development plan no. 402
Stand: 04.07.2024
- Local supply center Odenwaldallee - Legally binding since 27.06.2024
Announcement of the adoption of the 5th cover sheet for development plan no. 402 - Odenwaldallee local supply center - with integrated green space plan
On 15.05.2024, the City Council of the City of Erlangen adopted the 5th cover sheet for development plan no. 402 - Nahversorgungszentrum Odenwaldallee - for the area between Odenwaldallee in the north, the Evang.-Luth. Martin Luther Church in the east, the Büchenbacher Anlage in the south and the Catholic parish Zu den heiligen Aposteln in the west as a statute in accordance with Section 10 (1) of the German Building Code (BauGB).
The development plan with the explanatory memorandum and summary declaration as well as the DIN standards and other regulations mentioned in the provisions of the development plan are available for inspection by anyone at the Erlangen Office for Urban Planning and Mobility (Gebbertstraße 1, 3rd floor) during general office hours.
Upon request, information about its contents will be provided in room no. 305 by Mr. Fritsch, Tel. 86-1348.
With this announcement, the 5th cover sheet for development plan no. 402 - Odenwaldallee local supply center - comes into force in accordance with Section 10 (3) BauGB.
The statutory notices in accordance with Sections 44 (5) and 215 (2) BauGB are published following this announcement.
a) In accordance with Section 44 (5) of the German Building Code (BauGB):
If the property disadvantages specified in Sections 39 to 42 BauGB have occurred as a result of the development plan, the person entitled to compensation may demand compensation. He can bring about the maturity of the claim by applying in writing to the party liable to pay compensation (see Section 44 (1) and (2) BauGB).
A claim for compensation expires if the claim does not fall due within three years of the end of the calendar year in which the pecuniary disadvantages specified in Sections 39 to 42 BauGB occurred.
b) In accordance with § 215 Para. 2 BauGB:
The following shall be disregarded in the creation of this development plan
- a violation of the procedural and formal regulations specified in Section 214 para. 1 sentence 1 nos. 1 to 3 of the German Building Code (BauGB),
- a violation of the provisions on the relationship between the development plan and the land use plan, which is relevant under Section 214 (2) of the BauGB, and
- any deficiencies in the balancing process pursuant to Section 214 (3) sentence 2 BauGB,
if they have not been asserted in writing to the City of Erlangen - Office for Urban Planning and Mobility - within one year of the publication of the statutes, stating the facts justifying the violation.
The existing local shopping center on Odenwaldallee, which currently houses a Sparkasse branch, a supermarket, a restaurant and several small businesses, is now characterized by an outdated building complex and no longer meets current requirements. The site was acquired by an investor in 2018. The existing buildings are to be replaced by a modern, high-quality new building. An urban planning competition was held to develop a compatible urban planning concept.
The concept envisages a residential and commercial building with a local supermarket, small businesses and services. Apartments are also to be built in high-rise point buildings. On the one hand, this is intended to secure local supplies for the Büchenbach-Nord area and, on the other, to provide urgently needed living space within the urban area. The legally binding development plan no. 402 - Forchheimer Straße - does not permit the planned development, which is why the creation of the 5th cover sheet will create the necessary conditions under construction planning law.
Galerie
Department of Urban Planning
Anschrift
Öffnungszeiten
Individual appointments can also be arranged.