Schriftgröße erhöhen
Schriftgröße reduzieren
Kontrastmodus aktivieren
Logo der Stadt Erlangen
Suche öffnen

Wichtiger Hinweis

Diese Webseite wurde automatisch übersetzt. Möglicherweise enthält sie Fehler oder Ungenauigkeiten.

Construction work for parking area at the large parking lot

Stand: 04.07.2025

By the end of October, ground-level parking spaces will be created on the site of the former parking garage at the large parking lot.

Eine Absperrbake und eine aufgerissene Straße.The northern access to the parking lot road is therefore closed. It is not possible to turn out of the tannery at this point. Parking lot P4 remains open.

Number of parking spaces as before in the multi-storey parking lot

Following the demolition of the dilapidated multi-storey parking lot, work will now begin on a temporary parking lot at ground level. By the fall, 255 parking spaces and an additional four parking spaces for people with disabilities will be created there. The number of parking spaces corresponds to the capacity that was last available in the multi-storey parking lot. The former underground parking garage under the multi-storey parking lot has already been filled with recycled material. The area is now being paved, asphalted and landscaped.

Estimated costs of around 1.1 million euros

The new parking area is only temporary due to the ongoing planning for the "Regnitzstadt" project. In the future, more parking space is to be created in the "Regnitzstadt" than was previously available in the large parking lot through more efficient use of the space and modern parking garages. Based on the existing preliminary planning, the construction of the temporary parking lot is currently estimated to cost around 1.1 million euros.

Photo: City of Erlangen

Read also: Parking and free bus travel

Parking lot sign.
Parking lot, Parking garage, Bicycle, Bicycles, park, Bicycle bracket, Bus travel, PUBLIC TRANSPORT, VGN, Erlangen municipal utilities, ESTW, Tickets, Means of transportation, Mobility, Public transportation, Car, Bus, Railroad

Parking in Erlangen

There is free capacity in the multi-storey and underground parking lots around Erlangen city center at all times of the day. From there, shops, restaurants and cultural institutions can be easily reached on foot or by bus in the free city center area. All parking areas are signposted.

ESTW_Buses_Main_Street_June_2022
Page

Free public transport in the city center

Change for free! Free travel on the buses in Erlangen city center. Travel comfortably and quickly in Erlangen city center without looking for a parking space. Since January 1, 2024, it's been "free travel" on all bus routes within the free Erlangen city center area.

Civil engineering office

Head of office: Andreas Pfeil

The Civil Engineering Department of the City of Erlangen is responsible for the planning, construction, operation, maintenance and management of publicly dedicated traffic areas with the associated structures, other traffic facilities and traffic installations including lighting, traffic lights and other traffic infrastructure.

Anschrift

Schuhstraße 40
91052 Erlangen

Öffnungszeiten

jetzt geschlossen
Montag: 09:30 - 15:00 Uhr
Dienstag: 09:30 - 15:00 Uhr
Mittwoch: 09:30 - 15:00 Uhr
Donnerstag: 09:30 - 15:00 Uhr
Freitag: 09:30 - 12:00 Uhr

Appointments on site are only possible by appointment. Please contact us by phone, e-mail or fax.