The section between Nördliche Stadtmauerstraße and Martin-Luther-Platz is affected. Estimated period: June 2 to July 31.

Work on the supply network in Pfarrstraße by Erlanger Stadtwerke is scheduled to begin on June 2. In addition to the expansion of the fiber optic network, the electricity network in this area will also be renovated ahead of schedule. The section between Nördliche Stadtmauerstraße and Martin-Luther-Platz will be affected. This will be followed by the renewal of the road surface from July 6 to probably July 31.

Background:

The city of Erlangen and Erlanger Stadtwerke are using the summer months for several important infrastructure measures: In addition to the comprehensive renovation of the Dechsendorfer Dam, work will also be carried out on the water network in Münchener Straße and a road surface renovation in Pfarrstraße. The aim is to bundle the necessary construction measures and ensure the long-term efficiency of the traffic and supply infrastructure.

Eine sanierungsbedürftige Straße mit Häuser links und rechts. Pfarrstraße (Photo: Civil Engineering Office)

Here: Roadworks map

Read more

kachel_technischer_bereich_1
Page, Building site, Building, Construction plan, Construction sites

Construction sites & closures

We build and renovate for you. All current construction sites and road closures in the city can be found here.

A bridge with traffic signs and a car.

Extensive road construction measures after the Bergkirchweih

The east-west axis is affected: Dechsendorfer Damm, Münchener Straße and Pfarrstraße. The work will take place between June 2 and probably September 14.

Civil engineering office

Head of office: Andreas Pfeil

The Civil Engineering Department of the City of Erlangen is responsible for the planning, construction, operation, maintenance and management of publicly dedicated traffic areas with the associated structures, other traffic facilities and traffic installations including lighting, traffic lights and other traffic infrastructure.

Anschrift

Schuhstraße 40
91052 Erlangen

Öffnungszeiten

jetzt geschlossen
Montag: 09:30 - 15:00 Uhr
Dienstag: 09:30 - 15:00 Uhr
Mittwoch: 09:30 - 15:00 Uhr
Donnerstag: 09:30 - 15:00 Uhr
Freitag: 09:30 - 12:00 Uhr

Appointments on site are only possible by appointment. Please contact us by phone, e-mail or fax.