Construction sites that may have an impact on road traffic must be specially secured and signposted. The contractors responsible for the construction site must contact the road traffic authority in good time before work begins.
Stand: 05.03.2024. Link zum BayernPortal
Informationen
Roadworks in the road area and roadworks next to the road area that may affect traffic must be specially secured. The safety measures serve to protect road users (traffic area) and workers as well as equipment and machinery at the work site (work area).
The "signage" safety measure must be ordered by the road traffic authority or, in the case of road construction work, by the road construction authority. The contractor responsible for the construction site must contact the road traffic authority in good time before the start of such work and obtain an order on how the construction site is to be cordoned off and marked, in particular with traffic signs and traffic facilities, whether and how traffic is to be restricted, directed and regulated, even in the case of partial road closures, and whether and how closed roads and detour are to be marked. Contractors are obliged to comply with these instructions from the road traffic authority and, if the operation of traffic light systems has been ordered, to operate them.
Which signage is necessary to secure a roadworks site is determined on the basis of the particular local and traffic circumstances in each individual case.
The correct exercise of discretion by the road traffic authority or road construction authority is of particular importance here. Their orders regarding the establishment and securing of roadworks by means of signage must above all be measured against the principle of proportionality. This applies to the safety measures as well as the (traffic) impact on third parties caused by the roadworks.
Among other things, the interests of residents who are particularly dependent on the use of the road must be taken into consideration. This applies in particular when commercial enterprises are affected. Work sites must therefore be planned by the contractor in such a way that their duration and spatial extent impede traffic flow as little as possible. If the road space is temporarily not required for the construction site or if the circumstances temporarily allow traffic to be eased, this must be taken into account. Where possible, work on busy roads should be carried out at times when traffic is light.
In the case of longer work sites, care must be taken to ensure that the effective length and width of the work site for traffic is kept as short as possible, depending on the progress of the work. For the design of the necessary signage and the coordination of further measures, the road traffic authorities are assisted by the nationwide guidelines for securing roadworks. These include standard plans for roadworks on urban roads, rural roads and freeways.
Information can be obtained from the road traffic authorities at the district offices, independent towns and municipalities.
- Written application with details of the location of the workplace and the time frame of the work
- Traffic sign plan tailored to the individual case
Other documents that may be important in individual cases, such as detour plan, division plans, permit agreements, etc.
§ Section 45 (1) and (6) of the Road Traffic Regulations (StVO)
Regional Supplement (Editorially responsible: City of Erlangen)
Road traffic and roadworks department
The city of Erlangen is not responsible for matters relating to parking tickets.
Please contact the Zweckverband Kommunale Verkehrsüberwachung für den Großraum Nürnberg.
Anschrift
Öffnungszeiten
Outside of regular opening hours, individual appointments can also be arranged on site. Get in touch with us by phone, e-mail or contact form.