Building project; submission of documents for exemption from approval
You generally need a building permit to erect, modify or change the use of a facility. Under certain conditions, your building project may be exempt from the obligation to obtain planning permission.
Stand: 24.11.2024. Link zum BayernPortal
Online procedure
Building application online
You can use this online application to submit a building application.
Citizen-friendly and digital: simply complete this online application directly via your internet browser. In many cases, this will save you a trip to the authorities.
In principle, exemption from approval can be granted for all structures except for special structures. However, this is only possible under certain conditions (see "Conditions"). However, even if a project is exempt from approval, it must still comply with all regulations to be observed.
Even if all requirements for an exemption from approval are met, you are not entitled to such an exemption. It is at the discretion of the local authority to decide whether or not a building permit procedure should be carried out.
The construction, modification or change of use of a building may be exempt from approval under the following conditions:
- The project is not a special building,
- it is within the scope of a qualified development plan or a project-related development plan,
- it complies with the provisions of the development plan and any local building regulations,
- the development is secured and
- it is not a craft or commercial construction project for which the municipality has excluded the application of the permit exemption in the development plan.
In addition, the modification or change of use of attics for residential purposes, including the erection of dormers, may be exempt from approval under the following conditions:
- It is a project in an unplanned inner area in accordance with Section 34 (1) sentence 1 of the German Building Code (BauGB),
- the development is secured and
- it is not a craft or commercial construction project for which the municipality has excluded the application of the permit exemption in a development plan.
The municipality can declare that a building permit procedure is to be carried out despite these requirements being met.
Written submission
First of all, please note that in the case of building applications for the construction and alteration of buildings, the building documents must be prepared by an authorized draftsman (architect, civil engineer; for smaller building projects, especially detached and semi-detached houses, also master craftsmen in the building and carpentry trades and state-certified technicians in the field of construction technology). This also applies to documents in the approval exemption procedure.
- Submit the required documents to the municipality in whose area the building plot is located.
- The documents correspond to those of a building application together with building documents and must be submitted in triplicate using the forms provided.
- Notify the neighbors of the building plot of the building project at the latest when submitting the documents to the municipality. It is better if you involve the neighbors in advance by submitting the site plan and the construction drawings for their approval.
- The municipality can request that an approval procedure be carried out within one month of the documents being submitted. This means that the documents are automatically processed as a building application, provided you have noted this accordingly on the building application form. The lower building supervisory authority is responsible for examining and deciding on the building application.
- However, if the local authority does not request the simplified approval procedure within one month or informs you in writing that no approval procedure is to be carried out, your project is exempt from approval.
Digital submission
Digital submission of documents in the approval exemption procedure is not yet possible throughout Bavaria. This is only possible with certain lower building supervisory authorities. You can find out what these are in § 1 of the Digital Building Application Ordinance. You can find the link under the "Legal basis" tab.
- The documents can be submitted digitally using the online assistant.
- The predefined building application and building description forms are replaced by the queries in the online assistant. The building documents are uploaded to the online assistant in electronic form (files in PDF format).
- The signatures of the client and the authorized draftsman are replaced by authentication using the "BayernID" user account. In particular, the (large-format) construction drawings do not need to be signed. They can therefore be generated as a file directly in the CAD system of the design author. If the building documents have to be created by an authorized drafter, the drafter must authenticate himself and submit the documents for the client.
- The documents are first sent to the lower building supervisory authority, which forwards them immediately to the responsible municipality. The one-month period after which the project is exempt from approval begins with the submission of the digital documents.
If your building project is exempt from approval, you are responsible for ensuring that the requirements for exemption from approval are met and that public law regulations are complied with.
Please note that you must notify the lower building supervisory authority of the start of construction at least one week in advance, even for construction projects that do not require a permit.
In principle, there are no time limits.
However, if you only want to start construction more than four years after the construction work has become permissible due to an approval exemption procedure, you must go through another approval exemption procedure.
If the municipality does not inform you within one month of submission of the required documents that the simplified approval procedure is to be carried out, you may commence execution. This does not apply if the municipality applies for a provisional prohibition within one month of submission of the required documents.
- current extract from the land register
- Site plan
Not required if only the modification of structural installations is applied for, where exterior walls and roofs as well as the use are not changed. - Construction drawings
- Building description (see form under "Forms")
- Fire protection certificate, if applicable
Only required if it is checked by the building authorities and is not already included in the other building documents. - any necessary information on the secured development with regard to the supply of water and energy as well as the disposal of waste water and traffic development
Only required if the building project cannot be connected to a public water or energy supply or to a public sewage disposal system. Also required if the building project is not sufficiently wide enough to be connected to a public traffic area. - If applicable, consent to the transfer of the clearance area (see form under "Forms")
- Further documents if necessary
Depending on the building project, further documents may be required, such as a tree inventory declaration. However, this is only required if requested by the municipality.
Building application forms (all)
The binding building forms published by the Bavarian State Ministry of Housing, Building and Transport can be downloaded individually or as a zip file. You also have access to explanations of certain building application forms.
There are no fees for the permit exemption. If the municipality informs you before the end of the one-month period that no approval procedure is to be carried out, it can charge a fee for this if it has regulated this in a municipal cost statute.
Art. 58 Bavarian Building Regulations (BayBO)
Plan assumption
This is where all incoming applications are received, recorded and checked for completeness. Building applications that have significant deficiencies and therefore cannot be processed are returned to the applicant.
Anschrift
Öffnungszeiten
In addition, individual appointments can be arranged on site outside regular opening hours. Get in touch with us by phone, e-mail or contact form.